Sailing in Sept.
Well still enjoying the boat. We did get out Furling unit this past week.. but we will not put it on the boat this season.
I did stay out on the boat this past weekend of the 25th.. 8*c at night.. but it was fun, and the sail the next day was fantastic.
Haulout has been arranged.. wow.. went fast.
Outboard worked all season! :) Happy about that.. I will work on the cables for next year.
Boat performed awsome - Need to finish the handrail replacement and change the boom vang bail. The bail I had bought was for a dingy.. not a keel boat.. and it was a huge failure. I will put blank rivits in the holes, and then put the bail from a McGreger 26 on.. it was the right size, and $8.. how can you go wrong. But other than that everything else that needs to be done is cosmetic.
I will give a more detailed list.
Spring will bring some big jobs - including crack repairs, a soft spot in the cockpit sole repair and interprotect for the hull.
I have really enjoyed my G26 this season. I do have a dream of owning a Catalina 30 in the somewhat near future.. But this boat was an awsome get back in.